BAB A94 Munich – Pocking (A3), section Kühstein – Malching, earthwork and surface finishing Malching
4.6 km construction of the BAB A94 including substructure, superstructure, drain pipes
(DN 150 – DN 800; 11,500 m), 5 subsoil draines as well as earth-moving and surface construction work at the road network
in a joint venture


State road St 2580 – connection road in the east of the Munich Airport “Franz-Josef-Strauß”, stage VI
about 7 km road construction including rainwater retention basin and sedimentation tank
175,000 cbm soil improvement work
about 6.5 km construction of rural roads
in a joint venture


BAB A3 Regensburg – Passau, surface renewal Wörth/Danube
renewal of 2.2 km of the existing superstructure in both driving directions
deconstruction of the existing roadway including preparation and remaining superstructure
construction of the new non-mixed superstructure
for each driving direction a time frame of 25 days was available


A6 federal motorway Pfreimd - Wittschau, lot Wernberg: earthwork and surface finishing
10 km construction of the federal motorway A6 including construction of the motorway interchange A6/A93, a point of access and a rest area with lavatory facilities


A6 federal motorway, Kaltenbaum - Lohma, section Voßenstrauß: earthwork and surface finishing
8 km construction of the federal motorway A6
partly extension of the trunk road B14 including two points of access
reconstruction measures in the road network


Military training area Grafenwöhr, washing facility for armoured vehicles
construction of a washing facility for armoured vehicles with a closed water circulation system including purification, 660 m new construction of an asphalt road for armoured vehicles, 18,500 m² new construction of concrete traffic areas, steel constructions (720 tons concrete steel, 5,600 m³ concrete), ductile cast iron pipes DN 80 - 600, electrical and mechanical engineering
in a joint venture


Military training area Grafenwöhr, TA-1 Road
4 km road construction with rock excavation
5 km drain pipes
complete electrical equipment over a length of 4 km
1 bridge in framework construction
length = 20 m



Prestressed concrete - foreland bridge „Mainbrücke Nantenbach“
This foreland bridge was executed in prestressed concrete by using the place and thrust method.


Viaduct in the Wertach valley/Nesselwang, A7 federal motorway Ulm-Füssen, structure 106-1
free cantilevering construction of a steel concrete arch framed on a roadway with a temporary battered anchor span between arch and superstructure (temporary frameworks)
at the time of construction the bridge had the largest span of all arched bridges on motorways throughout Germany


Flood protection Pfelling
length of expansion approx. 1,880 m (thereof 1,370 m dike and 510 m wall), 60,000 m³ earthwork, 6,600 m² dampproofing wall (partly as bulkheads), 1,500 m² bored pile wall, subsoil improvement, geotextile separation layers, concrete work, 900 m pipe construction work (interior drainage)
road construction, ashlar work, construction of a water level measuring and pump station, demolition of the existing flood protection wall


Flood protection Öbling
length of expansion approx. 1,200 m, thereof 900 m dike and 300 m wall, about 80,000 m³ earthwork, approx. 10,000 m³ bulkheads, pressure grouted piles, subsoil improvement, geotextile separation layers, concrete work, pipe construction work
installed capacity of the pumping station Öbling III: max. 700 l/sec



Estate road and landfill lining, Macher paper mill
new construction of an estate road, 30,000 m³ embankment, lining of Macher’s factory landfill with 6,500 m² asphalt sealing and 2,500 m² plastic sealing strips, drainage and sewer in the sector road construction and landfill construction



Industrial area at the Amper, GADA A8 Bergkirchen
construction of estate roads
development of access roads and canal construction
earthwork for the construction of a hall


New plant GABO, civil engineering
78,000 qm topsoil excavation
69,000 qm soil stabilisation for open area and hall/building areas
backfilling of the planned paved area with 15,500 cbm filling material and antifreeze gravel, stabilisation of the hall and building area for factory floor


Construction of a sewage plant with a laboratory
turnkey construction of a central clarification plant with a laboratory for purification of chemical effluent water


Production plant for playground units in Traunreut
carcass with a production hall, an administration building, picking, stacking grounds and an impregnating system including outdoor facilities


Special purpose association industrial park “A9 Mitte Münchberg”
ground modulation of an industrial area: 85,000 m³ topsoil excavation, 105,000 m³ excavation of soil and soil replacement, 90,000 m³ excavation of soil including transport to a landfill, construction of a turning lane for road junction to the industrial area (with drainage), earthwork for an estate road (approx. 10,000 m³), supply and building soil
in a joint venture


Site development of the industrial area Gattendorf/Hof
210,000 m³ excavation and replacement for ground modulation and for construction of estate roads
700 m new construction of the trunk road B173 including road junction to the industrial area, rainwater retention basin (capacity of 40,000 m³ with a sealing of clay and concrete structures)
in a joint venture



New plant GABO, outdoor facilities including hydrant line
earthwork for rainwater retention basin, drainage canal work; outdoor facilities consist of 15,100 qm truck-asphalt road; 9,500 qm non-mixed stacking ground; 3,100 qm car-park and 420 qm sidewalk


Sewage installation/local sewerage system Hörafing, lot 23
local sewerage system with drainage and road reinstatement
DN 200 - DN 800


Sewage disposal Fridolfing, lot 09/10/11
local sewerage system with drainage and road reinstatement of both districts Eberding and Oberdorf
DN 200



State road St 2580 – connection road in the east of the Munich Airport “Franz-Josef-Strauß”, new construction stage V
road and bridge construction, maintenance for 25 years
length of structure approx. 4 km, adaption of the existing road network, 6 bridges, 4 settling ponds and rainwater retention basins with drainages StB DN 300 - DN 900 (total length approx. 4 km)
in a joint venture


State road St 2580 - connection road in the east of the Munich Airport “Franz-Josef-Strauß”; new construction stage IV
Public Private Partnership model, road and bridge construction, maintenance for 25 years. Length of structure approx. 3.5 km, adaption of the existing road network, 5 bridges und 3 culverts of corrugated steel, 5 settling ponds and rainwater retention basins with drainages StB DN 300 - DN 900 (total length approx. 2.5 km).