High-pressure gas pipeline WAG Plus 600 (Austria)
new construction of the loop line Kirchberg-Lichtenau 41 km, DN 1200, PN 90 including two pig trap stations and one isolating valve station
in a joint venture
|
|
|
High-pressure gas pipeline Rothenstadt-Schwandorf (Germany)
new construction of a gas pipeline from Rothenstadt to Schwandorf 40 km, DN 1000, PN 100 pipeline, civil and station construction work
|
|
|
High-pressure gas pipeline Mazara-Menfi (Italy)
new construction of a gas pipeline from Mazara to Menfi in Sicily/Italy 42 km, DN 1200, PN 85
pipeline, civil and station construction work in a joint venture
|
|
|
High-pressure gas pipeline UTE Arbos – Barcelona (Spain)
new construction of a gas pipeline Lot 1 Arbos – San Andreu de la Barca, 42 km Lot 2 San Andreu de la Barca – Barcelona, 30 km, DN 900, PN 80 in a joint venture
|
|
|
Gas-steam power plant in Irsching block 4 and 5
delivery and construction of the EK Fuel Gas Supply System for the gas turbine Irsching block 4 with a turbine output of 340 MWel and a gas-steam total output of 530 MWel as well as Irsching block 5 with a turbine output of 2 x 278 MWel and a gas-steam total output of 845 MWel
|
|
|
MEGAL compressor station Waidhaus, capacity increase
pipeline construction work, erection and assembly of the whole machinery piping to connect the machinery including measuring systems, filter, drying and cooling unit
|
|
|
Measuring and regulating station Schwandorf
delivery and operative construction of the gas pressure regulating station in Schwandorf DN 600/800, VN=1,800,000 m³/h, DP 100 bar
|
|
|
Measuring and regulating station Bierwang 5
plant construction including electrical measurement and regulating technology, input and outlet connecting lines input: DN 500, PN 80 outlet: DN 500, PN 70, VN=400,000 m³/h as a turn-key project
|
|
|
Natural gas pipe underground storage 60“ in Gutenswil (Switzerland)
new construction of a gas pipe underground storage in Gutenswil for a storage capacity of 286,000 Nm³ DN 1500, PN 70 connection piping DN 200, natural gas compressor including engine in a joint venture
|
|
|
Execution of welding and assembly work for a hydrogen liquefaction plant
dimensions: 1/4" - 5" material: 1,4571 location: Kansai/Japan
|
|
|
Tank farm Munich airport
aviation fuel lines DN 50 - 500 fire water and foam water lines DN 80 - 450 and 4 flat bottom tanks tankage 4,800 m³ flat bottom tank 12,000 m³ in a joint venture
|
|
|
Hydrant lines for Munich airport , section apron west, apron freight, apron east, RAMP 3 and Terminal 2 as well as connecting lines to the tank farm
aviation fuel lines DN 150 - 700 length = 27,500 m including hydrants and control pits
|
|
|
Plough-in of a water line in Rossbach
total length 3,000 m DA 160/SDR 11
|
|
|
Disposal gas pipeline in Außernzell 100-160
construction of 26 filter lances total length about 900 m
|
|
|
Crossing of the Main river in Hassfurt
total length 190 m DA 450 x 26,7
|
|
|
Tietjerksteradeel 702, Netherlands
in the course of a long-term drilling programme several drillings in series are constructed on fields of natural gas depth: 2,908 m (MD)
|
|
|
Merigon, France
in the south-west of France a drilling was executed on a natural gas field with a depth of 2,860 m
|
|
|
Römerberg 1, Germany
execution of a crude oil exploration drilling with a depth of 3,100 m (MD)
|
|
|
In situ geothermic drilling Groß Schönebeck, Germany
execution of a geothermic drilling with a depth of about 4,500 m (MD) The well is now used by the client for research purposes
|
|
|
Drillings for borehole heat exchangers, Deggendorf/Deggenau
office building STREICHER Maschinenbau GmbH & Co. KG 13 borehole heat exchangers, 100 - 160 m total drilling depth 1,720 m
|
|
|
KUPE Gas Project, New Zealand
offshore connection with two pipelines diameter 10 ¾’’ and 20’’ over a length of 2,300 m
|
|
|
Berri Causeway Flank 1 Water Injection + Qatif Oil Trunk Line, Saudi Arabia
two shore approaches with a length of 1,500 m (30’’) and 2,100 m (16’’)
|
|
|
North Bangkok Power Plant Gas Pipeline Project, Thailand
five crossings in the North of Bangkok total drilling length about 7,000 m.
|
|
|
Water supply to Saadiyat Island, United Arab Emirates
pipeline for water supply in Abu Dhabi twinline with 48’’ each.
|
|
|
5-year service contract for the pipeline area of BP in Gelsenkirchen
The pipeline area includes 27 different product lines. The services of PSI include: chemical and mechanical cleaning, product cleanout, drying with nitrogen or dry air, water pressure test, caliper pigging, procedure by intelligent pigs as well as complete project consultancy and organisation,
24h stand-by service.
|
|
|
Renovation/revaluation of the high pressure gas pipeline FB 10
Chemical and mechanical cleaning of individual pipeline sections (UT-pig procedure), execution of a pressure test and afterwards drying up to -25° C. The high pressure gas line DN 500 - permitted operating pressure of 64 bar (year of construction 1966) - complies now, after completion of the work, with the technical standard according to the DVGW regulations with a permissible operating pressure of 67.5 bar.
|
|
|
Pressure test of a high-pressure gas pipeline DN 900, Ferrara/Italy
On the pipeline (permissible operating pressure amounts to 100 bar) a pressure test was executed in 5 test sections from November 2007 till February 2008. The contract also included caliper pigging with the
PSI multi-channel caliper pig as well as the drying of the pipeline.
|
|
|
Pressure test of a high-pressure gas pipeline DN 1000, Lauterbach-Scheid, Hessen/Rhineland-Palatinate
Execution of a pressure test of 2 lots in 13 test sections on a pipeline, total length 120 km (constructed in 3 lots). The permissible operating pressure amounts to 100 bar. The pressure test was executed so that the test pressures came up to about 180 bar. The contract also included caliper pigging with the PSI multi-channel caliper pig as well as the drying of the pipeline.
|
|
|
Inspection of the newly constructed WAG 600 Plus loop line Kirchberg-Lichtenau
Execution of leak tightness and strength tests with water in 6 test sections, caliper pigging in 1 test section and air drying up to -25° C in 1 test section of a pipeline DN 1200, length 41 km. The transmission line DN 1200, length 2.6 km, from the Slovak border to the station in Baumgarten was also included in the execution of the project.
|
|
|
|
|