BAB A94 Munich – Pocking (A3), section Kühstein – Malching, earthwork and surface finishing Malching
4.6 km construction of the BAB A94 including substructure, superstructure, drain pipes (DN 150 – DN 800; 11,500 m), 5 subsoil draines as well as earth-moving and surface construction work at the road network in a joint venture
|
|
|
State road St 2580 – connection road in the east of the Munich Airport “Franz-Josef-Strauß”, stage VI
about 7 km road construction including rainwater retention basin and sedimentation tank 175,000 cbm soil improvement work about 6.5 km construction of rural roads in a joint venture
|
|
|
BAB A3 Regensburg – Passau, surface renewal Wörth/Danube
renewal of 2.2 km of the existing superstructure in both driving directions deconstruction of the existing roadway including preparation and remaining superstructure construction of the new non-mixed superstructure for each driving direction a time frame of 25 days was available
|
|
|
A6 federal motorway Pfreimd - Wittschau, lot Wernberg: earthwork and surface finishing
10 km construction of the federal motorway A6 including construction of the motorway interchange A6/A93, a point of access and a rest area with lavatory facilities
|
|
|
A6 federal motorway, Kaltenbaum - Lohma, section Voßenstrauß: earthwork and surface finishing
8 km construction of the federal motorway A6 partly extension of the trunk road B14 including two points of access reconstruction measures in the road network
|
|
|
Military training area Grafenwöhr, washing facility for armoured vehicles
construction of a washing facility for armoured vehicles with a closed water circulation system including purification, 660 m new construction of an asphalt road for armoured vehicles, 18,500 m² new construction of concrete traffic areas, steel constructions (720 tons concrete steel, 5,600 m³ concrete), ductile cast iron pipes
DN 80 - 600, electrical and mechanical engineering in a joint venture
|
|
|
Military training area Grafenwöhr, TA-1 Road
4 km road construction with rock excavation 5 km drain pipes complete electrical equipment over a length of 4 km 1 bridge in framework construction length = 20 m
|
|
|
Prestressed concrete - foreland bridge „Mainbrücke Nantenbach“
This foreland bridge was executed in prestressed concrete by using the place and thrust method.
|
|
|
Viaduct in the Wertach valley/Nesselwang, A7 federal motorway Ulm-Füssen, structure 106-1
free cantilevering construction of a steel concrete arch framed on a roadway with a temporary battered anchor span between arch and superstructure (temporary frameworks) at the time of construction the bridge had the largest span of all arched bridges on motorways throughout Germany
|
|
|
Flood protection Pfelling
length of expansion approx. 1,880 m (thereof 1,370 m dike and 510 m wall), 60,000 m³ earthwork, 6,600 m² dampproofing wall (partly as bulkheads), 1,500 m² bored pile wall, subsoil improvement, geotextile separation layers, concrete work, 900 m pipe construction work (interior drainage) road construction, ashlar work, construction of a water level measuring and pump station, demolition of the existing flood protection wall
|
|
|
Flood protection Öbling
length of expansion approx. 1,200 m, thereof 900 m dike and 300 m wall, about 80,000 m³ earthwork, approx. 10,000 m³ bulkheads, pressure grouted piles, subsoil improvement, geotextile separation layers, concrete work, pipe construction work installed capacity of the pumping station Öbling III: max. 700 l/sec
|
|
|
Estate road and landfill lining, Macher paper mill
new construction of an estate road, 30,000 m³ embankment, lining of Macher’s factory landfill with 6,500 m² asphalt sealing and 2,500 m² plastic sealing strips, drainage and sewer in the sector road construction and landfill construction
|

|
|
Industrial area at the Amper, GADA A8 Bergkirchen
construction of estate roads development of access roads and canal construction earthwork for the construction of a hall
|
|
|
|
|
New plant GABO, civil engineering
78,000 qm topsoil excavation 69,000 qm soil stabilisation for open area and hall/building areas backfilling of the planned paved area with 15,500 cbm filling material and antifreeze gravel, stabilisation of the hall and building area for factory floor
|
|
|
Construction of a sewage plant with a laboratory
turnkey construction of a central clarification plant with a laboratory for purification of chemical effluent water
|
|
|
Production plant for playground units in Traunreut
carcass with a production hall, an administration building, picking, stacking grounds and an impregnating system including outdoor facilities
|
|
|
Special purpose association industrial park “A9 Mitte Münchberg”
ground modulation of an industrial area: 85,000 m³ topsoil excavation, 105,000 m³ excavation of soil and soil replacement, 90,000 m³ excavation of soil including transport to a landfill, construction of a turning lane for road junction to the industrial area (with drainage), earthwork for an estate road (approx. 10,000 m³), supply and building soil in a joint venture
|
|
|
Site development of the industrial area Gattendorf/Hof
210,000 m³ excavation and replacement for ground modulation and for construction of estate roads 700 m new construction of the trunk road B173 including road junction to the industrial area, rainwater retention basin (capacity of 40,000 m³ with a sealing of clay and concrete structures) in a joint venture
|
|
|
New plant GABO, outdoor facilities including hydrant line
earthwork for rainwater retention basin, drainage canal work; outdoor facilities consist of 15,100 qm truck-asphalt road; 9,500 qm non-mixed stacking ground; 3,100 qm car-park and 420 qm sidewalk
|
|
|
Sewage installation/local sewerage system Hörafing, lot 23
local sewerage system with drainage and road reinstatement DN 200 - DN 800
|
|
|
Sewage disposal Fridolfing, lot 09/10/11
local sewerage system with drainage and road reinstatement of both districts Eberding and Oberdorf DN 200
|
|
|
State road St 2580 – connection road in the east of the Munich Airport “Franz-Josef-Strauß”, new construction stage V
road and bridge construction, maintenance for 25 years length of structure approx. 4 km,
adaption of the existing road network, 6 bridges, 4 settling ponds and rainwater retention basins with drainages StB DN 300 - DN 900 (total length approx. 4 km) in a joint venture
|
|
|
State road St 2580 - connection road in the east of the Munich Airport “Franz-Josef-Strauß”; new construction stage IV
Public Private Partnership model, road and bridge construction, maintenance for 25 years. Length of structure approx. 3.5 km, adaption of the existing road network, 5 bridges und 3 culverts of corrugated steel, 5 settling ponds and rainwater retention basins with drainages StB DN 300 - DN 900 (total length approx. 2.5 km).
|
|
|
|
|