High pressure gas pipeline NEL lot 3, 4 and 5 (Germany)
construction of the NEL (North European Gas Pipeline) from Banzkow to Levitzow length: 105 km, DN 1400, DP 100 civil and pipeline construction works as well as installation of the valve stations
|
|
|
High pressure gas pipeline OPAL, lot 11-14 (Germany)
construction of the OPAL (Baltic Sea Pipeline Link) from Finsterwalde to Olbernhau length: 136.5 km, DN 1400, DP 100 civil and pipeline construction works including valve stations and river crossings (e. g. crossing of the river Elbe near Meißen) in a joint venture
|
|
|
High pressure gas pipeline UGS NBZ/7 Fields (Germany/Austria)
construction of the high pressure pipeline from Haiming (Bavaria) to Nussdorf/Zagling (Austria) length: 45.0 km, DN 600; length: 25.9 km, DN 900; DP 100
microtunneling through the river Salzach, 730 m, DN 2000 (external diameter) civil and pipeline construction works including pig and valve stations, microtunneling in a joint venture
|
|
|
High pressure gas pipeline WAG 600 Plus, Loop Baumgarten-Enzersfeld (Austria)
construction of the OMV WAG Plus 600 Loop Baumgarten-Enzersfeld and of the PVS line G00-040 as a parallel pipeline length: 52 km, DN 1200; length: 3,9 km, DN 800; DP 90 civil and pipeline construction works including pig and valve stations in a joint venture
|
|
|
Gas pipeline OLT Livorno Project (Italy)
construction of the onshore connecting pipeline to the OLT re-gasification terminal near Livorno length: 7.3 km, DN 32’’ civil and pipeline construction works including microtunneling
|
|
|
Pipeline connection Mittelplate (Germany)
construction of 6 trenches, length: 70 m, width: 6 m and 12 m (6 m x 2 m) drillings from 1,100 m to 1,400 m length, DN 250 and 150 by HDD crude oil pipeline: length: 7.5 km, DN 250; PN 100 deposit water pipeline: length: 7.5 km, DN 150, PN 250 pipeline works and drillings
|
|
|
EGS storage plant Bierwang gas regulating station ME 05 (Germany)
complete construction of the gas measuring and regulating station in Bierwang input and output lines, filter, preheater, regulation, measuring in-feed/outlet pressure: 100 bar input: DN 80, outlet: DN 65 Vn = 4,500 m³/h
|
|
|
Construction, delivery and erection of the gas steam power plant Hemweg (Netherlands)
Vn = 78,839 m³/h gas turbine: type SGT 5-4000 F steam turbine: type SST 5-5000 total performance of gas steam power plant: 435 Mwel
|
|
|
Construction of the gas measuring and regulating station S.8010 Schnaitsee 2 (Germany)
system technoloy, pipeline and civil construction works, including connecting lines DN 500 and tying in DN 700, outdoor installations delivery and installation of heating technology Vn = 180,000 m³/h in-feed/outlet pressure: 100 bar, input/outlet: DN 500
|
|
|
Internal turbine piping, Titan 250 S/Waidhaus (Germany)
installation of the internal turbine supply lines for fuel gas, seal gas, sealing air, lubricating oil cooler and unbend lines CrNi-steel, da 33,7 – da 273, DP 155
|
|
|
Manufacturing and delivery of the pig trap for the pipeline Pfaffstätt-Oberkling (Germany)
manufacturing and delivery of 3 pig traps for the lines Pfaffstädt and Oberkling 2 pig traps DN 500/DN 400, PN 250 bar 1 pig trap DN 700/DN 600, PN 100 bar
|
|
|
20-kv-supply line from the PV plant Berga to the transformer station Herzberg (Germany)
20 KV-cable 3x1x400 mm²; length of the route: 13,000 m routing, route inspection with the road construction authority, civil construction works, compensation for the neighbouring owners, cable laying, assembly of cable fittings, measuring of the sheath faults and digital measuring; laying in open construction method as well as by plough and horizontal directional drilling method
|
|
|
Construction of the water pipeline from Wallersdorf to Reissing (Germany)
length: about 9,300 m, steel DN 300, PN 16 (thereof: 8,000 m torpedo ploughing method) laying of a triple conduit fitting including blowing in of a data cable from the elevated tank to the outlet structure laying of a outlet pipe from the elevated tank to the outlet structure length: about 600 m, PE HD da 355, PN 16; pipeline and civil construction works, pressure test
|
|
|
Cable connection PV plant in Wisselsing (Germany)
laying of a 20 KV cable from the PV plant in Wisselsing to the inlet in Plattling-Pielweichs incl. laying of a conduit fitting da 50 for optical fibre cable length of the route: 17 km
|
|
|
Construction of a biogas pipeline in Hassfurt (Germany)
length: 3,850 m, PE-HD da 180 x 16.4 mm, PN 1, DN 150 pipeline and civil construction works, welding works, horizontal directional drilling, pressure test, installation of 8 condensate pits
|
|
|
Disposal gas pipeline in Außernzell 100-160 (Germany)
construction of 26 filter lances total length about 900 m
|
|
|
Oil/injection drilling Römerberg Speyer (Germany)
oil/injection drilling depth: from 2,420 m to 3,117 m
|
|
|
Oil/observation drilling Schoonebeek Field (Netherlands)
oil/observation steem thrust drillings alltogether: 73 drillings at 18 clusters depth: from 800 m to 1,800 m
|
|
|
Drillings for gas near Groningen (Netherlands)
drillings for gas depth: from 2,100 m to 4,800 m (MD)
|
|
|
Geothermal drilling Honselersdijk GT1 and GT2 (Netherlands)
geothermal drilling (doublette) depth GT1: 3,190 m, depth GT2: 3,100 m 2 drillings at a drilling site of 2,500 m² flow rate 45 l/s, temperature of the thermal water 86°C 32 bar
|
|
|
Merigon, France
in the south-west of France a drilling was executed on a natural gas field with a depth of 2,860 m
|
|
|
In situ geothermic drilling Groß Schönebeck, Germany
execution of a geothermic drilling with a depth of about 4,500 m (MD) the well is now used by the client for research purposes
|
|
|
Devil Creek Development Project (Western Australia)
shore approach for the installation of a 16’’ gas pipeline length: 2,100 m pipeline construction and commissioning
|
|
|
Oleoduto RNEST (Brazil)
three drillings by microtunneling length: 170 m, 114 m, 86 m for 56“ steel pipes as casing for a 46“ oil pipeline first microtunneling project for the client Petrobras
|
|
|
Río Camisea (Peru)
two river crossings for the installation of a 16“ gas pipeline and a 10“ casing, a helicopter brought the equipment to the drilling location (rain forest)
|
|
|
Qeshm Island
underground crossing of the „Street of Hormus“ between the Iranian mainland and the Qeshm Island for the installation of a 16“ product pipe as connecting line length: 3.060 m
|
|
|
Inspection of gas pipeline network
VNG-AG Leipzig length: 530 km
|
|
|
ELT/automation and process control engineering
E.ON Thüringer Energie AG 250 plants
|
|
|
Gas pressure and regulating plants/biogas plants
Energieversorgung Gera 10 plants
|
|
|
Cathodic Corrosion Protection
delivery, erection, commissioning of the Cathodic Corrosion Protection system, data remote supervision and measuring at the OPAL length: 480 km, DN 1400, MOB 100 bar
|
|
|
Macedon project (Australia)
natural gas pipeline in the North-East of Australia length: 82 km in 2/3 sections, DN 500 cleaning, pressure tests, caliper pigging, drying
|
|
|
Connecting line Gazelle, border line Germany/Czech Republic
gas pipeline at the German-Czech border to the station Brandov, as connecting line to the OPAL length: about 105 km, DN 1400 pressure test, caliper pigging, drying for lot 2 and 3
|
|
|
Baltic Sea Pipeline link (OPAL)
length: 210 km, DN 1400 pressure test, caliper pigging, air drying
|
|
|
North European Gas Pipeline (NEL)
length: 112 km, DN 1400 pressure test, caliper pigging, drying
|
|
|
|
|