Reference projects plant construction

Fuel gas supply systems

Gas supply system Azura Edo

Gas supply system Azura Edo for Benin City (Nigeria)

Technical data: Design pressure 100 bar, capacity 459 MW, heating capacity 16 MW,
welds total 2,500, pipe length total 1,500 m
Scope of services: Concept, planning, complete manufacturing of the gas supply system, delivery in 26 containers to Nigeria

PDF

BHKW plant

BHKW plant for self-sufficient power supply in Ahlen

Assembly of all components of the BHKW plant (6 gas engines, heat exchangers,
cooling system and chimneys) as well as pipeline construction for exhaust gas,
gas supply, hot water, cooling water, ventilation and oil supply plus their isolation
The assemblies were carried out while parralel running production.

Gas storage facility Bordolano

Gas storage facility Bordolano (Italy)

Scope of contract: 3 double-stage turbo-compressor units, gas processing system (LTS- Low Temperature Separator),
7 connecting lines DN 10" and 6 connecting lines DN 6"
Scope of work: construction and installation of gas processing and compressor plant

PDF

Transfer and pressure regulating station Groß Schwaß

Transfer and pressure regulating station Groß Schwaß (Germany)

The station is made of two operation lines and two stand-by lines with different flow rates:
Large load plant: 44,000 Nm³/h
Small load plant: 10,000 Nm³/h
Scope of work: design, engineering, construction and commissioning

Compressor station Turkmenistan

Skid mounted units for compressor station in Malay (Turkmenistan)

Condensate pump, electrical preheater, gas pressure regulating stations
Scope of work: design, engineering, construction and assembly of the units

Gas processing facility VIURA

Gas processing plant VIURA Early Production Facility (Spain)

Design pressure: 204 bar, design temperature: -85 to +150°C
Scope of work: basic and detail engineering, steel structure, fabrication and delivery of 27 vessels and 1 storage tank

PDF

Turbine technology

Replacement TENP gas turbine

Replacement of a gas turbine on compressor station TENP (Germany)

The scope of work includes the replacement of the following units: gas turbine, oil cooler, air intake system, heat exchanger.

Refinery engineering

Refinery furnace PCK Schwedt

Reconstruction of furnace PCK Schwedt (Germany)

Scope of work:
Construction of a furnace roof
Prefabrication of radiation zones, convection zones as well as peripheral lines
Disassembly of the existing furnace roof
Hoisting and assembly of the new furnace roof 

Regenerator hood

Assembly of regenerator hood with cyclone unit (Germany)

Scope of work:
Assembly of a regenerator hood for the FCC plant
Assembly of the cyclone unit with 8 cyclone couples, wall thickness: 22 - 35 mm
Lifting of the regenerator hood (99,8 t) to the pre-assembly rack (height: 14 m)
Connecting and welding with the cyclones as well as the stainless steel flapper valves