Civil engineering work for the installation of cable protection pipes using open and closed construction methods. Execution in joint venture with Josef Rädlinger Bauunternehmen GmbH.
Client:
TenneT TSO GmbH
Construction Period:
2024 - ongoing
Services:
- Approx. 45 km route length
- 2 systems with 2 DA 280 cable conduits each (projects 5 and 5a)
- 20.6 km open construction
- 18.6 km ploughing method
- 3.09 km HDD (24 crossings), 18,500 m drilling length
- 174 m pipe jacking (4 crossings)
Topsoil removal and creation of an archaeologically assessable excavation subgrade to determine the status quo before the start of construction planning for the SuedLink project.
Client:
TransnetBW, SuedLink GmbH & Co. KG
Construction Period:
2023 - 2025
Services:
- Approx. 450 km route length (10 construction lots)