Welcome

to the STREICHER Group

News

Full-electrically driven horizontal directional drilling rig rig
Part of a vacuum chamber from ALD moved into the boring mill hall by heavy load vehicle
Full-electrical driven horizontal directional drilling rig HDD80-E
PTC
Road and bridge construction, civil and structural engineering services for Tunnel Rothenstein, Germany
vacuum chamber system S-Cube
Golda-Meir-Steg connects Europacity with district Moabit
STREICHER carries out RoboCT
DrillTec location Deggenau
Hydrogen plant
STREICHER Perspektiven on Facebook/Instagram
Fair "regioFORSCHA Niederbayern" with great success
VTA Image Video
Non-destructive testing
metering stations for natural gas
Territory of Zeelink pipeline
Deggenau Gebäude
EUGAL
IPLOCA environmental award
GeoTHERM
Azubis 2018
Val de Saône
Geothermal drilling in Luttelgeest
Azura Edo
Drilling with 600 m
Dr. Peter Ramsauer

You did not activate the necessary cookies for this content.

activate necessary cookies and show content